Back to Blog
Sscv sleipnir6/11/2023 ![]() This setup also makes this vessel the first crane vessel with dual-fuel engines, allowing it to operate sustainably almost anywhere. ![]() Heerema plans to use LNG as the primary fuel, with 8,000 cubic meters of LNG storage capacity giving the Sleipnir the ability to stay on station for one month or cross the Atlantic. The vessel is powered by 12 dual-fuel 8 cylinder engines at up to 8 MW of power each, operating on diesel or LNG for a total of 96 MW of power. to transport several crane parts for the new SSCV Sleipnir from the Huisman fabrication yard. SSCV Sleipnir The world’s largest dual-fuel (LNG and MGO) semi-submersible crane vessel built by Sembcorp Marine Ltd for Heerema Marine Contractors (HMC). The columns and pontoons are rounded and streamlined to reduce drag as well. BigLift Shipping was assigned by Heerema Offshore Services B.V. The 23.75 m or 77.9 foot tall columns house ballast tanks and LNG storage, as well as a staircase that connects the pontoons below the surface with the deck above. Named after the Norse God Odin’s eight-legged stallion and newly completed at Sembcorp Marine's Tuas Boulevard Yard, SSCV Sleipnir has a 220 meter by 102 meter (722 feet by 394 feet) reinforced. Coupled with GE’s electric propulsion system, the vessel will see lower emissions when on operations. These columns are symmetrical fore and aft, making it more stable in rough seas than some other vessels that use bigger columns under the cranes for more support. Christened in May of 2019, it only recently took the title of world’s largest crane vessel from another of Heerema’s ships, the SSCV Thialf. Sleipnir is the world’s first crane vessel with dual-fuel engines running on either marine gas oil (MGO) or liquefied natural gas (LNG). The work included the transportation and installation of two jackets for client Ørsted that will provide the foundation for the Hornsea 2 wind farm’s RCS and OSS platforms. HUET + Emergency Breathing System - Falck (OPITO approved)Ĭompressed Air Emergency Breathing System, 0.5c (CA-EBS) - Falck (OPITO approved)īasic Offshore Safety Introduction and Emergency Response Training (NOGEPA 0.The Sleipnir was named after the Norse God Odin’s eight-legged horse and like that fabled steed, the vessel Sleipnir is constructed as a platform on eight columns, with a pontoon on each side. Heerema’s SSCV Sleipnir has safely and sustainably completed its second project in the wind sector this season, having earlier executed the HKZ installation. ![]() MFG works with certified drone operators, including off-shore.īasic Offshore Safety Induction and Emergency Training (OPITO), incl. Whatever the project might be, from the smallest detail, to the most imposing vantage, we will capture what you wish to show your customers. The new vessel Sleipnir will be equipped with twin heavy lifting. The tour has therefore changed to a tour on DCV Thialf, also on 20 February. 3.2 HMC have been planning to build a new SSCV with even higher capacity than SSCV Thialf. Our expertise is providing your company with a face of its own, be it through film or web/graphic expression. Please be informed that SSCV Sleipnir is not in Rotterdam on 20 February 2020. ![]() MFG is a media company that specializes in aerial footage. Contact us for more information or a price 32d
0 Comments
Read More
Leave a Reply. |